Monday, February 18, 2019

Vykuntapuram barrage

Kvnswami:


Vykuntapuram Barrage is under construction project on [[Krishna River|krishna river]] 23KM up stream of Existing [[Prakasam Barrage]] with FRL 25M to store <ref>Liquid error: wrong number of arguments (1 for 2)</ref>10 TMC of Flood water Coming from Vyra,Munneru rivers. The Back water of this barrage will extend beyond [[Pokkunuru]] up to the toe of [[Pulichinthala Project|Pulichintala dam]].[[List of Chief Ministers of Andhra Pradesh|Andhra Pradesh Chief Minister]] [[N. Chandrababu Naidu|Nara chandrababu Naidu]] Laid Foundation stone<ref>Liquid error: wrong number of arguments (1 for 2)</ref> for this project on 13-02-2019.


'''Salient Features:'''

Vykuntapuram Barrage salient features as follows<ref> New Barrage In Amaravati|date=2019-02-17|url=https://www.youtube.com/watch?v=B5YpO-rvYS8|access-date=2019-02-18}}</ref>.
{| class="wikitable"
|Storage capacity (in TMC)
|:
|10 TMC
|-
|River Basin
|:
|Krishna River
|-
|Purpose
|:
|Irrigation and water supply
|-
|Length of Barrage
|:
|1187.5 M
|-
|Length of Earth Bund
|:
|1807.5 M
|-
|Pond level (m)
|:
| + 25 M (MSL)
|-
|Number under sluice /bays
|:
|12 Nos
|-
|Width of Under sluices/bays
|:
|15 X 8 M
|-
|Crest Level
|:
| + 17 M (MSL)
|-
|Number of Barrage Bays
|:
|56 Nos
|-
|Width of Barrage Bays
|:
|15 x 7 M
|-
|Crest Level
|:
| + 18 M (MSL)
|}
<br />


from Wikipedia - New pages [en] https://en.wikipedia.org/wiki/Vykuntapuram_barrage
via IFTTT

No comments:

Post a Comment